Find answers, ask questions, and connect with our community here!

Activity Feed Forums Floor Prep Ardex Reply To: Ardex

  • CHRISTOPHER

    Member
    August 5, 2021 at 10:04 am

    Joe, thanks for the reply. The depth varies, but the lowest is 1/4″ below the level of the laminate. I’m figuring a 1/4 trowel , would leave a 1/8 bed, so in some spots I’m 1/8 off, others 1/16, and on the edge against the door, more than 1/8. I was trying to avoid moldings, but its not the end of the world if I use them, either. I had this idea of using grout on the main section of the tile, but then using the matching mapei silicone caulk on the edge butting up against the laminate. ??? Feel free to shoot that idea down, though, I have no idea how that hold up. lol I just need need a solid plan so I dont do this 2 or 3 times. ????