-
It’s my time to say “Where should I start?”
I completed my drawings and uploaded them to my documents after scanning. I have a full house of 7 segments to do. I’m thinking of starting with the main room for the reason that it is centered to the house at one wall and is a large room. Next move to the master bedroom to the right, which is another large room with a small closet. Master bath stays tile. Next would be to do the front sitting room, then kitchen, then off to the other 2 bedrooms/bathroom. The one undecided at this time is laundry room off front foyer. I want to LVP, wife wants to leave it tile. Joe, I did sign up for the University so please take a look and advise. Next step for me will be to start prep with removal of existing flooring and cutting door jambs. And, of course, watching videos.