-
Completed first floor of my house (Whew!)
After an injury, Covid, and the flu TWICE, it only took me six months to complete this project. (In my defense, I was only working in the evenings and could only work a little at a time before I got tuckered out. This ol’ man is not used to crawling around on his hands and knees for extended periods of time.)
You can see in the pics that my baseboards aren’t in yet. I’m getting that done professionally. From three rooms with carpet, two three with tile, a tile entryway, and Pergo in the dining room…. to one beautiful run of LVP throughout the house. Looks good. Very happy w/the result.
Log in to reply.