-
Blueprint Request Chow Lark
Hi Joe, thanks so much for taking a look! Attached the blueprint with numbers associated with attached photos.
Attached video walkthrough link: https://photos.app.goo.gl/AU1TH47TM1FHWwKw9
Questions:
1) Upstairs. Buildup or tear down? Should I tear down the tile bathroom or build up the bedrooms and hallway to tile height with 0.75″ OSB?2) Downstairs. Layover? I’m hoping I could layover the existing laminate and vinyl and tile. They are all the same height.
3) Downstairs tile in kitchen. See photo “Chow 2”. damaged tile. Do I grind it flat?
4) Concern with tearing down or laying from subfloor. reusing baseboards would then leave the paint line because the new floor would be lower than current line.
Thanks Joe!
Tony
Log in to reply.